top of page

 hhumitec Models

Four configurations. One DMR technology.

The choice of model depends on the shape, size and construction characteristics of the building.

ONE
Single device for smaller buildings.
Indicative radius: approx. 10* m

TWO
Single device for larger buildings.
Indicative radius: approx. 20* m

ONE·S  Syncro

Coordinated configurations with multiple devices.
Indicative radius: approx. 10* m per device

TWO·S  Syncro

For large buildings and coordinated configurations.
Indicative radius: approx. 20* m per device

* Indicative radii. Actual sizing depends on the characteristics of the building.

Solutions and pricing

 

​

​

​

​

​

​

​​​

SYNCRO Models

​​

​


 

​​

​

For large buildings and coordinated configurations, with monitoring, support and full warranty.
Prices include Italian VAT. Non-EU exports may exclude Italian VAT; international shipping, import duties and local taxes are extra.

​

* Indicative coverage, depending on the geometry and characteristics of the building.

How to get started

Three steps. One accurate assessment.

​

  1. ESSENTIAL INFORMATION
    The age of the building and the areas affected.

  2. FLOOR PLAN AND PHOTOS
    A floor plan — or a measured sketch — and a few photos of the affected walls.

  3.  TECHNICAL VIDEO CALL
    We contact you to review the spaces and determine the most suitable configuration.

From assessment to installation

​

ASSESSMENT AND SIZING
We analyse the documentation and determine the appropriate model, number of devices and correct positioning.

​

ONE AND TWO — GUIDED INSTALLATION
Once the building is deemed suitable, you receive a personalised installation guide showing the recommended installation point and the necessary instructions.

​

ONE·S AND TWO·S — PROFESSIONAL INSTALLATION
Positioning, installation and Syncro configuration are carried out by hhumitec technicians or authorised professionals.

Frequently asked questions

• Can hhumitec be installed where walls are frescoed?
Yes. Installation requires no cutting, demolition or injections, and the device is not fixed to the frescoed surface. In protected heritage settings, positioning is agreed with the professionals responsible for conservation.

​

• How long does it take to see results?
The first noticeable results generally appear after around 10 months. The process typically takes 10 to 30 months, depending on the building conditions, and progress is verified through periodic measurements.

​

• Does the device need to remain switched on at all times?
Yes. It operates 24 hours a day with a power consumption of 1.2 W, equivalent to approximately 10.5 kWh per year. A brief power interruption does not affect the process.

​

• Can the progress of moisture reduction be verified?
Yes. Progress is monitored through comparative measurements at predefined points, according to a protocol tailored to the building and the selected service.

hhumitec

Smart solutions for rising damp

bottom of page